ICT PROJECTS

ICT PROJECTS

VERTIV PARKLANDS

  • ROLE

    EPC

  • VALUE

    R80 million

ISF ICT Infrastructure was appointed by Vertiv to deliver a high-quality prefabricated modular Tier III compliant data center system for a clients facility. The solution consists of 120 racks with expansion to up to 486 racks and built around industry-leading VertivTM power (including the Liebert® TrinergyTM Cube UPS) and thermal management technologies (including room cooling, and SmartAisle containment and control), as well as advanced Lithium Ion batteries for reduced operational expenses..

OPEN CONNECT MALAWI DATA CENTRE

  • ROLE

    EPC

  • VALUE

    R140 million

ISF was appointed as the EPC Contractor to build a prefabricated data center (Power Module + SmartMod MAX). The data centre consists of 1 x Power Module 400kW and 2 x SmartMod MAX modules with 78kW of IT load each. Deployment – Lilongwe Malawi

MTN ACE LANDING STATION

  • ROLE

    Main Contractor

  • VALUE

    R87 million

ISF Construction appointed to construct the onshore landing station and all critical systems located at Melkbostrand in the Western Cape.

Africa Coast to Europe (ACE) is an optical-fibre submarine cable system serving 24 countries on the west coast of Africa and Europe.

ADC DATA CENTRE COMMISSIONING

  • ROLE

    Independent Commissioning Agent

  • VALUE

    R600 million

ISF provided Independent Commissioning Agent services in line with Microsoft requirements for the design oversight and Level 4 to 5 commissioning for the AZTEC Data Centres in Midrand and Cape Town.

MASCOM BOTSWANA TECHNICAL CENTRE AND OFFICES UPGRADES

  • ROLE

    Development Managers

  • VALUE

    R168 million

ISF was appointed to develop a new Technical Centre and offices to address recent and future GSM traffic requirements. Construction involved :-

  • 806.6m² of usable conditioned Technical Centre area
  • 1788m² of Office Area ( Ground and 1st Floors)
  • 532m² of Energy Centre
  • 54 meter Transmission Hub Lattice Tower

BOTSWANA INNOVATION HUB – GOVERNMENT INTERGRATED DATA CENTRE

  • ROLE

    Project Management – Stages 1 to 3

  • VALUE

    364 million (BWP) – Stage 3 Estimate

Design and build a Tier IV Data Centre certified the by Uptime Institute with a white space of 1000m2, a NOCC and integrated BMS systems. Equipment load of 1500w/m2.